Client: Waltham Forest
Consultants: NPS
Value: £112,000

Town Hall

Installation of specially modied TRVs together with a number of electric energy meters.

Assembly Hall

Large air to water run-around coil systems were introduced to a modified duct work system to recuperate any residual heating effect from the extract air and then, by means of pipe work, put it back into the main air stream.

The system incorporated a twin pump, pressurisation system and dosing pot and balancing valves. The existing fan and motor drive belts were stripped out and new motors with inverter drives installed.